Creative Hardwood Floors

An Investment in Quality, Restorations & Installation of All Types of Hardwood Floors.

Creative Hardwood Floors - (813) 684-3224 - An Investment in Quality, Restorations & Installation of All Types of Hardwood Floors.

 Phone:

(813) 684-3224

Specialties:

Sanding And Refinishing Hardwood Floors And Installation Of New Hardwood Floors

  • Licensed, Insured & Bonded

  • Locally Owned

  • Emergency Service Available
Hardwood FloorHardwood Flooring ServicesCreative Hardwood Floors - (813) 684-3224 - An Investment in Quality, Restorations & Installation of All Types of Hardwood Floors.National Wood Flooring Association

Creative Hardwood Floors

Phone: (813) 684-3224

E-mail: Info@creativehardwoodfloorsinc.com  

Hours of Operation:

Monday - Friday: 08:00 AM to 05:00 PM

We Accept:

Cash - Mastercard - Check - Visa

Affiliations & Certifications:

National Wood Flooring Association (NWFA)

Authorized Brands:

Bruce, Minwax, Mirage, Mohawk & Robbins

What to Expect

EXPECTATIONS & PREPARATION

 

Wood floors add value and beauty to your home, but with any major improvement you should expect some disruption and inconvenience. We will employ our experience, the latest equipment and the most environmentally safe materials to complete the work with the latest possible disruption.

 

However, you should be aware of the following factors:

 

PRE-INSTALLATION REQUIREMENTS

 

• The building should be completely closed in, with outside windows and doors in place.

• All wet trades (drywall, paint, ceramic tile, etc.) should have completed the work.

• Air Conditioning, heating and ventilation systems should be operating.

• The temperature and relative humidity should be at "normal living conditions".

• The wood flooring should then acclimate to conditions at the jobsite for three to five days.

• Furniture, appliances, or old floor coverings should be removed from rooms where wood flooring is to be installed.

 

INSTALLATION EXPECTATIONS

 

• We will use plastic sheets to seal off the work area from other rooms. Nonetheless, some dust could infiltrate into other areas.

• There will be sawing, hammering and other noise during installation.

• The installation should take _ days. Allow approximately five days after installation is complete before sanding and finishing begin. You may walk on the floors during this time.

 

SANDING & FINISHING EXPECTATIONS

 

• There will be noise, dust and some fumes during the sanding and finishing process.

• Even though we will seal off the work area from other rooms, dust from the sanding process could infiltrate to other areas.

• Because of the fumes that will be released during finish application, the pilot light must be turned off.

• Please keep pets away from work area.

• A typical finish job (approximately 1,000 sq ft.) takes two days of sanding, with stain (if any) applied on the second or third day. Finish is applied on the fourth and fifth days;  you may not walk on the floors while stain and finish are wet.

• When the work is completed, you may need to replace or repaint your base and shoe moldings, as well as your walls. Also, be prepared to remove the fine dust that may have accumulated, despite our best efforts to contain it.

 

 